Production Schedule

More of our pre-production work and Damian volunteered to do the production schedule as he likes pre-production, and is a very organised person with quite a bit of experience making spreadsheets. Here is Damian’s posting of the full schedule. And Here is the day it was created.

Website Proposal

One piece of our pre-production was the “website proposal” which Ben did as he was the one who had some free time, with Damian and I busy with other things. Here is a link to the day it was created. And Here is Ben’s posting.

Site Map

Below is a site map of our finished website that I created as part of our preproduction and to ease navigation. Key: Straight line – on another page Doted line – on the same   page but  requires scrolling

Client Feedback

After we had finished the website I emailed our client to tell her that we were done and to get some feedback, (all correspondence can be found here.) The client, while thinking that “the photos, the logo also general page layout I feel is good” she also had a number of improvements she wanted us…

Module Index

For this module, we were put into groups. Down below are the documents that are required, of which the unnamed belong, or have been written by me. Website Website proposal: Ben’s Document Production schedule: Damian’s document Equipment list Group correspondence Client correspondence Production diary: Day 1 Day 2 Day 3 Day 4 Day 5 Day 6…

Text For Module

For the module I have been writing the text for the website, using some of our client’s previous information from her old website. Down below is everything I have written, the process of which can be found here. Home Welcome to Art-Ceramics, I am a ceramist located in Cockington and I produce sculptures. Please feel…

Day 6: Production

Today I continued with the pre-production, needing to finish the loose ends while Ben edited the photos for the gallery page and banners while Sunny actually  worked on some of the website while Damian also did some pre-production for some of the photos. It was particularly hard since we kept cropping into issues with WordPress,…

Production of Website

Here is the evolution of our website from the wire frame, to the photoshopping, onto the finished product, mostly done by Ben and Sunny. Wire Frame The wireframe was to think about what the website should look like if we had complete creative control, though we figured out quickly that we wouldn’t have that much…

Meeting Minutes

The following is an account of meetings my team and I have had, but can be expended on in my “Days”. (30/04/2016) Type of meeting: Introduction Note taker: Me Attendees: Myself, Ben, Damian Discussion:  we discussed what we should ask our client; roles; people’s strengths and weaknesses; how best to keep in touch with one…

Group Correspondence

Here is the group emails exchanged throughout the module.   Sunny’s email Damian talking about his progress Damian sharing updates Sharing Sunny’s email Absences Ben asking Sunny his thoughts on the logo   Damian adding me  as an admin while we work on the website Damian sending a link to the schedule  

Client Correspondence

For this module, communication is key. Not just with ourselves but with our client. Here is a log of my emails with her. first email  to confirm that I had the correct address: Email to get approval on the text I had written for the “About Me” page Emails correcting spelling mistake Emails for Photo Request by…

Day 5: More Development

After Ekow talked to us about the uses of raw images, Ben began to start the animation our client requested. Starting in Photoshop, he started to make the waves to animate with an alpha channel. Damian went through some of the things Ekow told us and Sunny continued work with his website design. I continued…